Monday, July 23, 2007

Pouring Concrete Footings


The footings in the front of the house were poured just to the level of the bottom surface of the existing concrete. The workers used a string and tape measure to keep the concrete level and to the desired level in the trenches.


The footings for the major wall structure were carefully poured the same way.

No comments: